Page tree
Skip to end of metadata
Go to start of metadata

Project plan per the milestones described at Danube

 

MilestonesTimepoint
(MS0) Open Intent to ParticipateDone

(MS1) Planning complete (scenarios or deliverables defined)                   

        scenarios that Daisy4NFV will support in Danube:

            os-nosdn-nofeature-ha (Who is the owner of this Scenario?)

10/25/16
(MS2) Detailed test case descriptions communicated to test project teams11/22/16
(MS3) Installer integration with OpenStack completed11/30/16

(MS4) Infrastructure updates completed                                        
        Probably this page is need to be fill in?
            Scenario Infrastructure
        Althrough we are planning to contribute a POD to OPNFV but it may

        not qualified to be a CI baremetal POD in Danube release.

12/6/16   

 

(MS5) Scenario integration and Feature Freeze completed   

1/13/17    

(MS6) Test cases implemented, preliminary documentation completed,

      and stable branch open                                                 

        Preliminary documentation:

            Installation Guide

1/26/17 

 

(MS7) Stable branch window close

3/10/17   

(MS8) Formal test execution completed

3/20/17

(MS9) JIRA issues assigned to release closed or deferred3/22/17

(MS10) Documentation completed                                               

        User manual

        Installation Guide

        Rlease Notes

3/24/17
(MS11) Release Danube 1.03/27/17

(MS12) Release Danube 2.0

5/4/17
(MS13) Release Danube 3.06/8/17
  
  • No labels